A major break in the TM-15 district heating line near Krasnorechenskaya and Industrialnaya streets in Khabarovsk interrupted heat and hot-water service on November 21, 2026, at around 3:50 a.m. local time, according to the region’s governor, Dmitry Demeshin.
Initially, 147 facilities, including 125 residential buildings, were affected, with the governor estimating roughly 40,000 people impacted. Some customers were shifted to an alternative heating main. Officials later reported 82 facilities still without service, including residential buildings and preschools.
Repair crews used heavy equipment and pumps to remove hot water from the damaged area before reaching the broken pipe. The scale of the water leak and wintry conditions complicated the response.
In an update dated November 22 in Khabarovsk local time, the governor said the damaged section had been welded, the pipe refilled, and heat was beginning to reach residential neighborhoods. He warned it could take several more hours for radiators to become warm. Completion of repair work does not necessarily mean every home’s temperature has already returned to normal.
The immediate questions for residents are when indoor temperatures will fully recover and whether interruptions will result in adjustments to utility bills. WE PNW has not independently verified service restoration for every building, and is not reporting a citywide return to normal without further evidence.
This report summarizes statements by regional officials and local reporting. The accompanying image is an AI-generated editorial illustration, not a photograph of the incident.
WE PNW Editorial Desk

